
Located within the borders of Yahyalı, Kayseri, Yahyalı WPP attained a production license on 07.09.2011 thanks to BAK ENERJİ ÜRETİMİ A.Ş. The first acceptance by the Ministry of Energy and Natural Resources for Yahyalı WPP whose construction started in 2016 was made in 2016 and the plant’s 82.5 MW-section was put into use in 2017. Of the 10.35 MW-capacity increase permitted in 2019, the 9 MW was put into use in 2023 upon its acceptance by the Ministry of Energy and Natural Resources. Yahyalı WPP has an installed capacity of 91.5 MW with 25 Vestas V126 3.3 MW-turbines and two Vestas V150 4.5 MW-turbines. Plus, the plant was given permission to increase its capacity further to 20.4 MW in 2022. Procedures to incorporate the capacity of 20.4 MW into the license are on track.
In addition to wind energy capacity increases, a 71.4 MW auxiliary solar power plant was approved for hybrid operation in 2021.
Work on SPP establishment continues, with the complete capacity expected to be operational by 2024.
Address: Yahyalı / KAYSERİ
Phone/Fax: 0352 619 1201 / 1200




